Ixion Hudswell Clarke update

We have today received the following email:-

“Dear All,
We have now approved the design work and drawings for the revised tooling. As you can see from the attached CAD drawings, the joint on the saddle-tank will be moved down to a more natural break. We have also revised the bunker to remove the unsightly horizontal join line. The new tools are expected to be completed by 23rd March and we hope to have revised decorated samples shortly thereafter. Meanwhile, I have enclosed photos of the second engineering prototype with the uncorrected body-work finished in the lined green livery. Please note that the horizontal joints on the saddle-tank and bunker will eliminated in the final version. ”